Bay Window Movement Solved Without Rebuild

Unstable Ornate Bay Window Fully Repaired Without Rebuilding

Like many Victorian/Edwardian bay window properties, this home in SE London was suffering from movement of the bay window masonry.  The lack of structural integrity was affecting the entire front of the property.

The severe bay window distortion required urgent structural repairs to avoid collapse. AWT solved the bay window issues and preserved the valuable period features around the door and windows. Prompt structural repairs are far less expensive and disruptive than rebuilding a collapsed bay window.

  • No rebuilding work
  • No visible fixings
  • No need to empty the rooms
  • No need to remove or replace windows

Simply filling cracks and repointing brickwork will not halt the progressive movement of bay window masonry.

The Structural Problem

A combination of age and inadequate restraint has allowed the bay window to pull away from the main elevation. The door arch and 1st-floor window were also cracking and dropping. Such serious defects, if not addressed by suitable structural repairs, will result in the ultimate failure and collapse of the structure.

Specialist structural repairs preserve valuable period features & protect the property value.

simple horizontal - Bay Window Movement Solved Without Rebuild
SE London Bay Window 04 1 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 05 1 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 03 1 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 13 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 18 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 15 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 12 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 06 1 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 02 - Bay Window Movement Solved Without Rebuild
Gaps Between Window Frame & Brickwork
Leaning Bay Window Columns
Gaps at Top of Bay Windows
Bay Window Plaster Cracks
Cracked Stonework
Cracks in Plaster & Coving
Bay Window Brickwork Cracks
Gaps Between Window & Brick
Unstable Bay Window
 
simple horizontal - Bay Window Movement Solved Without Rebuild
  • Significant distortion and outward movement of the ground and first-floor bay window brickwork columns
  • Gaps opening up between the window frames and the bay window columns
  • Cracking at the junctions with main elevational brickwork
  • Cracking in internal plaster
simple horizontal - Bay Window Movement Solved Without Rebuild
SE London Bay Window 10 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 08 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 16 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 20 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 14 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 17 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 11 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 09 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 19 - Bay Window Movement Solved Without Rebuild
Cracking Bay Lintel
Cracking Bay Sill
Cracks in Plaster & Coving
1st Floor Bay Cracks & Gaps
Cracking & Dropping Lintel
Cracking Doorway Stonework
Cracked Bay Lintel
Cracked Bay Sill
1st Floor Bay Cracking
 
simple horizontal - Bay Window Movement Solved Without Rebuild
  • Distortion and cracking of the bay window masonry lintels
  • Cracking of the bay window sills
  • Significant cracking to the front first-floor window masonry lintel
  • Entrance door masonry arch cracking

The Structural Solution

Simply filling cracks and repointing brickwork will not halt the progressive movement of bay window masonry. Specialist structural repairs are the most cost-effective solution.

simple horizontal - Bay Window Movement Solved Without Rebuild
SE London Bay Window 24 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 21 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 22 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 23 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 25 - Bay Window Movement Solved Without Rebuild
Bay Window Realignment
Strengthening Bay Window
Repairing Stone Door Arch
Brick Columns Realigned
Repairing Cracked Brickwork
 
simple horizontal - Bay Window Movement Solved Without Rebuild

The structural repairs included:

  • Temporary supports for the ground and first-floor bay window lintels
  • Realignment of the brickwork columns and masonry lintels using equipment designed by AWT
  • Restraints for the slender brickwork bay window columns
  • Stainless steel corded joint reinforcement to form a deep masonry beam
  • Stainless steel bed joint reinforcement within the masonry of the bay window
  • Grouted helical bar to reconnect the bay window brickwork and masonry
  • Grouted helical bar to reconnect the bay window to the main elevational brickwork
  • Stainless steel lateral restraints resin bonded to the masonry
  • Repairs to cracked and spalled masonry including decorative door arch
  • Repointing the heritage brickwork with the appropriate, colour-matched mortar and pointing style
simple horizontal - Bay Window Movement Solved Without Rebuild
SE London Bay Window 27 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 28 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 30 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 29 - Bay Window Movement Solved Without Rebuild
Bay Window Structural Repairs
Strengthening Bay Window Lintel
Realign/Reinforce Lintel & Masonry
Bay Window Sill Repairs
 
simple horizontal - Bay Window Movement Solved Without Rebuild

The formation of continuous beams within the existing masonry redistributes the upper-storey loads and restrains diagonal cracking and bulging tendencies.

All the original, ornate stonework was preserved and a coat of paint then completed the transformation.

Specialist structural repairs preserve valuable period features and protect the property value. Repairing, rather than rebuilding failing period bay windows can save homeowners thousands of pounds.

simple horizontal - Bay Window Movement Solved Without Rebuild
SE London Bay Repairs 01 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 31 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 35 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 32 - Bay Window Movement Solved Without Rebuild
SE London Bay Window 34 - Bay Window Movement Solved Without Rebuild
Repaired & Repainted
Realigned/Reinforced Bay Columns
Decorative Arch Repaired & Strengthened
Lintel Realigned & Repaired
Lintel, Columns & Sill Repaired
 
simple horizontal - Bay Window Movement Solved Without Rebuild

Action Wall Ties are specialist structural repair contractors with the skills and experience required to repair ornate period bay windows.  AWT work with property owners, structural engineers, architects, project managers and local authorities on large and small projects.

AWT are available in London, Essex, Surrey, Kent and Sussex. To arrange a survey or to discuss project details, please use our contact form, email us or call us on 01227 721 255.

Collapsing Ornate Bay & Balcony

Victorian Bay Window & Balcony: Structural Repairs & Restoration

victorian portico bay - Collapsing Ornate Bay & Balcony

This beautiful example of ornate Victorian architecture in Thanet was at risk of imminent collapse due to severe structural issues. The property had visible significant movement including bowing, cracking, dropping of brickwork arches and bowing columns of the front bay window and to the front elevation.

Several companies had surveyed the problems but none offered any solutions. Previous repairs to the property had tackled the symptoms of the structural defect but had failed to cure the root cause of the problem.

It took just 2 weeks of work for AWT to complete a cost-effective, long-term structural repair. Compared to rebuilding work, the disruption to the residents was minimal.

The Structural Problem

The structural issues with this period property in Thanet, Kent were clearly visible. Wide gaps had opened up between the masonry and the window frames. The structural defect had caused damage from the ground floor bay window columns up to the decorative brickwork panels below the eaves. This entire section of the property was in severe danger of collapse.

Bay Window Issues

 

AWT’s inspection of the front bay window found significant distorting movement to the front ground floor causing:

  •  outward movement
  • dropping and cracking of the brickwork arches and stone quoins
  • significant outward bowing of brickwork columns beyond the tipping point

 

First Floor Masonry Issues

Inspection of the front elevational brickwork found signs of distorting movement of the ground floor supporting bressummer beam (over the bay window) causing:

  • dropping of the supported main elevational brickwork
  • dropping brickwork pier stone quoins
  • dropping window arches above the bay window
  • inward sloping and cracking of the brickwork above the bay window

As part of previous attempts to halt the movement of the masonry, the bressummer beam over the bay window had been replaced by an old-style RSJ.

Bay & Portico Balcony Issues

The owners also wanted to deal with some aesthetic problems with the bay and portico balcony balustrade’s decorative wrought iron panels and stone top rails. All the panels required refurbishment. The bay window’s stone top rail had been replaced with an unattractive concrete capping. The portico stone top rails were mainly missing. New stones, in keeping with the period features, were needed to complete the restoration.

The Structural Solution

AWT recommended realigning and reinforcing remediation work to the existing brickwork including:

  • brickwork realignment
  • bed joint reinforcement
  • brickwork arch repair
  • diamond drilled grouted anchors
  • lateral restraints
  • grout tie injection
  • stonework & brickwork repairs
  • addition of fabricated steel spines to the columns
  • addition of an internal restraint post to the first floor

This multi-faceted approach reinstates uniformity and provides restraint to the masonry.

AWT also carefully removed the balcony balustrade panels for refurbishment. The lugs were replaced with stainless steel before the panels were grit blasted, powder-coated black and refitted. The brickwork corner piers were rebuilt. Finally, AWT had replacement capping stones cast in a limestone material with stainless steel reinforcing and bedded them in position.

Fast, Cost-effective, Minimal Disruption, Long Term Structural Repairs

Tackling such serious structural issues using traditional building techniques would have required reconstruction and rebuilding of the front of the property. Rebuilding would have been expensive, slow and highly disruptive to the homeowners. Damage to the original bricks and ornate stonework would be inevitable.

In just 2 weeks, AWT’s long-term repairs were completed without major rebuilding work or visible fixings to mar the internal or external period features.

Action Wall Ties are specialist structural repair contractors with the skills and experience required to repair and restore period properties.  AWT works on large and small projects for property owners, structural engineers, architects, project managers and local authorities.

AWT are available in Kent, London, Essex, Surrey and Sussex. To arrange a survey or to discuss project details, please use our contact form, email us or call us on 01227 721 255.

Crumbling Stone Corbels on Mock Tudor Property

Failing Stone Corbel Supports & Distorted Bay Window

mock tudor corbel failing - Crumbling Stone Corbels on Mock Tudor Property

The first floor masonry of this 1930s mock Tudor house in Hounslow, West London, was being supported with temporary props. The 2 stone corbels that are vital to support the jettied first floor masonry were failing, leaving the upper storey without adequate support.

Cracks had formed inside and outside the property and the masonry was becoming distorted.

The Structural Problem

simple horizontal - Crumbling Stone Corbels on Mock Tudor Property
crumbling support corbels - Crumbling Stone Corbels on Mock Tudor Property
failing support corbels - Crumbling Stone Corbels on Mock Tudor Property
Hounslow corbel failing - Crumbling Stone Corbels on Mock Tudor Property
stone corbel failing - Crumbling Stone Corbels on Mock Tudor Property
Crumbling Support Corbels
Failing Support Corbels
Corbel Failing
Stone Corbel Failing
 
simple horizontal - Crumbling Stone Corbels on Mock Tudor Property

This West London home was in a serious condition when AWT was called in. Temporary props were in place to support the upper storey masonry because the stone supports had failed. The mild steel within the corbel stones had rusted and expanded causing these vital supports to crumble. The knock-on effect of the failing corbels included distortion and cracking around the bay window.

As with many properties that AWT is called in to repair, the property showed signs of previous cosmetic repairs that had failed to address the structural issues.

The Structural Repair Solution

simple horizontal - Crumbling Stone Corbels on Mock Tudor Property
corbel structural repairs - Crumbling Stone Corbels on Mock Tudor Property
mock tudor corbel replacement - Crumbling Stone Corbels on Mock Tudor Property
new stone corbels - Crumbling Stone Corbels on Mock Tudor Property
london corbel replacement - Crumbling Stone Corbels on Mock Tudor Property
replacement stone corbel - Crumbling Stone Corbels on Mock Tudor Property
Corbel Structural Repairs
Mock Tudor Corbel Replacement
New Stone Corbels
Corbel Replacement London
Replacement Stone Corbel
 
simple horizontal - Crumbling Stone Corbels on Mock Tudor Property

The corbels – the stone support brackets – were beyond repair. The team at AWT made replacement masonry corbel stones that replicated the shape of the originals. The new corbel stones were manufactured in cast limestone with high-quality stainless steel reinforcing bars to provide a long lasting solution that will resist spalling.

AWT installed additional temporary supports before removing the old corbels stones, checking the surrounding brickwork and making it ready for the replacement stones. Despite the serious nature of the structural defect, the impact on the internal finishes was kept to a minimum. The ground floor front room wall and ceiling, including sections of the fibrous cornice, were cut away in the immediate area of the corbels to accommodate the repair works.

The new supports were then installed, the disturbed brickwork was repointed and the small area of disturbed render was repaired. Internally the areas of disturbed plaster were made good, leaving it ready for redecoration.

Bed joint reinforcement was also employed to restore the structural integrity of the bay window brickwork that had suffered distortion due to the inadequately supported weight of the upper storey masonry.

Action Wall Ties are specialist structural repair contractors with the skills required to replace failing stone corbel supports on period and heritage properties. AWT works along with property owners, architects, project managers and local authorities on large and small projects.

AWT are available in Kent, London, Essex, Surrey and Sussex. To arrange a survey or to discuss project details, please use our contact form, email us or call us on 01227 721 255.

Edwardian Stucco column remediation

London Edwardian Stucco column remediation

Edwardian portico structure with stucco columns cracking and failing – stabilising remediation works involved precision diamond drilling into the edge of the rounded columns directly into the centre of a half brick wall and the injection of grout

case study 56e199f6b5d7f7.59403455 - Edwardian Stucco column remediation

The subject building was a substantial, traditionally-built, elegant Edwardian Stucco finished domestic house in Central London.

This period property required work to remedy cracking and parting of the entrance porch structure without detracting from the look of the property.

Action Wall Ties have highly trained staff with a wealth of experience in dealing with period properties. AWT used their own design of diamond drilling equipment to drill for, and install, ties to strengthen the structure. The property was then made good using special mortars to match the existing finish.

Detailed Case Study

Defect

Cracking to the junctions of the front portico stucco columns with the main elevational walls was reported and noted.

case 7 a - Edwardian Stucco column remediation

case 7 b - Edwardian Stucco column remediation

Discussion

An underpinning scheme was completed, addressing the downward movement leaving the superstructure to be reconnected. Action Wall Ties’ remediation works were designed to assist in restraining the masonry to return the integrity to the structure.

Structural repair solution

The remediation works involved precision diamond drilling into the edge of the rounded columns, directly into the centre of a half brick wall by 1800mm each way to accommodate the injection of grouted ties, reconnecting the columns and walls (as indicated with green lines).

case 7 c - Edwardian Stucco column remediation

case 7 d - Edwardian Stucco column remediation

With the structure stabilised the cracked junctions of the columns with the main elevation were raked out cleaned and injected with cementitious grout, finished and made good with concrete repair mortar.

case 7 e - Edwardian Stucco column remediation

Action Wall Ties have, over many years, developed specialised equipment and methods to facilitate precision diamond drilling in almost any location, into almost any substrate, drilling 20mm diameter holes up to 3 meters long, through to 80mm diameter holes to almost any length, to accommodate the proposed remediation works (i.e. the removal of corroding steel and or installing many types of fixings).

Action Wall Ties have developed methods, and trained skilled experienced operatives, to strive to finish works to be sympathetic with the existing by attempting to match replacement bricks, pointing style and mortar mixture for texture and colour.

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair in London and Kent, providing professional solutions to a wide variety of structural problems. Contact us on 01227 721 255, or email us.

Bowing brickwork piers and dropping arches

Bowing brickwork piers and dropping arches

Victorian two-storey bay window with bowing brickwork piers and dropping arches – realignment, bed joint reinforcement beaming, lateral restraints, reinforcement to the brickwork columns and grout ties and concrete repairs to masonry cill

case study 56e19a0041f610.58831797 - Bowing brickwork piers and dropping arches

The subject building was a traditionally built mid-terraced domestic Victorian/Edwardian house in South London on two floors below a pitched tiled roof.

Bowing brickwork piers and cracking, dropping and sagging of the structure around the bay window required urgent attention. Using equipment and methods designed by Action Wall Ties, the bay window was reinforced and repaired.

Detailed Case Study

Defect

Action Wall Ties’ investigation reported distortion and distress with localised cracking to ground floor, external spandrel brickwork and cracking and dropped key stones to the brick arches.

case 8 a - Bowing brickwork piers and dropping arches

The slender brickwork columns to the ground floor had bowed outwards leaving a bow shaped space between the timber box window frame and the brickwork column that has been repeatedly re-pointed.

case 8 b - Bowing brickwork piers and dropping arches

case 8 c - Bowing brickwork piers and dropping arches

The bay window has a very large overhanging cill with supporting corbelled knees.

Causation

Action Wall Ties reported that the movement noted was considered to be progressive due to a combination of ageing and ineffective restraining of the slender brickwork columns and rotational effect of the overhanging cills, causing the bowing out of the columns and the arches to spread, crack and drop – cracking the supported spandrel brickwork above.

Structural repair solution

Our remedial scheme involved the introduction of bed joint reinforcement beaming, lateral restraints, reinforcement to the brickwork columns and grout tie injections, together with concrete repairs to masonry cill, all to reinstate the uniformity of the wall and provide restraint.

We provided temporary support to the underside of the ground floor brick arch key stones, removed the debris from the cracks and lifted the stones/arch back into a more level line with the adjacent brickwork.

case 8 d - Bowing brickwork piers and dropping arches

As indicated with red double dotted lines on our proposal 1, we introduced two rows of twin stainless steel corded joint reinforcement, forming a deep masonry composite beam.

As indicated with green parallel lines on our proposal 1, the beam reconnected the bay window elevational brickwork, and this was accomplished with AWT designed equipment enabling us to diamond drill through each elevation and chase into the main elevational brickwork and install a grouted helical bar.

The formation of continuous beams within the existing masonry should redistribute the upper storey loads, to a large extent, to those parts of the supporting structure, below which are best able to carry them while at the same time assisting in restraining diagonal cracking and bulging tendencies.

As indicated with yellow stars on our proposal 1, in conjunction with the beams, we drilled for, and screwed direct into the timber floor joists, 8mm stainless steel lateral restraints – all resin bonded to the masonry.

As indicated with green parallel lines on our proposal 1, to assist in alleviating the rotation affect from the large cills we installed grout ties vertically, drilling for and injecting a grouted 8mm helical bar.

As indicated with blue parallel lines on our proposal 1, we introduced a purpose fabricated steel reinforcing post, fitted and fixed to the inside of the brickwork columns, fixed with stainless steel resin bonded fixings.

case 8 e - Bowing brickwork piers and dropping arches

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair, providing professional solutions to a wide variety of structural problems in South London and Kent. Contact us on 01227 721 255, or email us.

1930s style low-rise apartment blocks

1930s style low-rise apartment blocks in London

An estate of 1930s style low-rise blocks of apartments with defective balustrade walls (half-brick thick) to access deck and private balconies – AWT’s remedial scheme – remedial restraint posts, removal of the existing reinforcing rebars.

case study 56e19a6488aa69.06564038 - 1930s style low-rise apartment blocks

The subject buildings are 1930s style low-rise blocks of apartments, conventionally built of solid brickwork and concrete floors, with open access decks and private balconies.

Structural Problems

• Visible cracking and previous repairs (in a similar pattern) were noted to the balustrade half-brick thick walls.

• Generally the brickwork and pointing was found to be in good condition, with little spalled pointing and bricks noted. Previous repairs to the access decks and private balconies balustrade half-brick thick walls in a similar pattern were noted.

• All access decks and a representative sample of private balcony balustrade walls were inspected and scanned, locating the reinforcing bar position. Some bars were uncovered, inspected and photographed. In the main, previous repairs correspond to the pattern of the existing reinforcing bars.

• The reinforcing bars uncovered were the old ½ inch rebar bent up from the concrete slab and built into the centre of the brickwork up to, and possibly into, the cast in-situ concrete coping.

case 16 a - 1930s style low-rise apartment blocks

Discussion

The existing half brick balustrade walls contained mild steel reinforcing bars. From our investigations it was apparent the damage to the brickwork (cracking/spalling/previous repairs) resulted from the expansive corrosion of these bars which reduced the effectiveness of the bar, especially at the asphalt tuck line leaving the wall vulnerable to failure represent a safety issue.

case 16 b - 1930s style low-rise apartment blocks

The reinforcing bars viewed had corroded, delaminated and expanded, rendering the bars ineffective. The half-brick thick balustrade wall’s stability is dependent on the reinforcing.

case 16 c - 1930s style low-rise apartment blocks

Wrought iron decorative panels, built in lugs viewed, assessed to be corroded, delaminated and expanded, lifting and cracking the brickwork.

Stuctural Repair Solution

AWT have previously successfully completed remedial schemes to ameliorate similar defects at many other blocks.

AWT’s remedial scheme involved the development of methods and the design of equipment to enable us to undertake the remedial reinforcement, installing restraint posts, expansion joints, removal of the existing reinforcing rebars and thereafter make good the brickwork to the balustrade walls, to the access decks and to the private balconies.

The remedial scheme also alleviated the need for the removal and replacement of the balustrade walls, along with all the associated problems that this would have entailed for the occupants with the added benefits of a considerable cost saving and resulting impact on the environment.

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair, providing professional solutions to a wide variety of structural problems in Kent, London and Surrey. Contact us on 01227 721 255, or email us.

 

 

1930s style low-rise apartments with balustrade wall defect repairs

1930s style low-rise apartments with balustrade wall defect repairs

An estate of 1930s style low-rise blocks of apartments with balustrade wall defects – corroding mild steel balusters cracking masonry to half-brick thick balustrade walls – removal of the baluster embedded into the coping stone and brickwork,case study 56e19a8525f9e9.55425313 - 1930s style low-rise apartments with balustrade wall defect repairs

The subject buildings are 1930s low-rise blocks of apartments in London, of conventional brick and filler joists construction, with open access decks and private balconies.

The Structural Problem

Cracking and dislodging of the brickwork and coping stones to the balustrade walls of the private balconies was reported and noted.

Discussion

Action Wall Ties investigated the defects and reported that the causation was found to be due to expanding corrosion of the handrails mild steel supporting balusters built into the masonry.

case 19 a - 1930s style low-rise apartments with balustrade wall defect repairs

The corrosion of the embedded mild steel results in the formation of ferrous oxide that expands to several times the thickness of the metal it has resulted from, thus breaking out of the brickwork splitting bed joints and lifting of the brickwork.

case 19 b - 1930s style low-rise apartments with balustrade wall defect repairs

Structural repair solution

case 19 c - 1930s style low-rise apartments with balustrade wall defect repairs

Action Wall Ties remediation involved cutting the baluster at the coping stone line, removal of the baluster embedded into the copping stone and brickwork, and completing repairs to the brickwork and coping stone. AWT re-drilled holes down into the walls for grout and designed all the necessary stainless steel fixing plates, thereafter welding the original baluster to a fixing plate.

case 19 d - 1930s style low-rise apartments with balustrade wall defect repairs

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair, providing professional solutions to a wide variety of structural problems in Kent, London, Surrey and Essex. Contact us on 01227 721 255, or email us.

Balustrade wall defects

Balutrade wall defects in West London

An estate of 1930s style low-rise blocks of apartments in West London with balustrade wall defects – remedial restraint posts to walkway balustrade walls, cutting expansion joints

case study 56e19a8f41e004.53961310 1 - Balustrade wall defects

The subject building is part of an estate of 1930s style low-rise blocks of apartments in West London of conventional brick and filler joists built construction with open access decks and private balconies.

Problems with cracks in the Balustrade walls

This very large building is curved with convex walkway balustrade walls.

Outward stepping at the base of the walls, together with outward leaning and cracking of the brickwork and coping stones to the walkways’ balustrade walls, was reported and noted.

Discussion

Action Wall Ties investigated the defects and reported that the causation was found to be due to seasonal moisture, thermal expansion and contraction i.e. hygrothermal movement.

The expansion had pushed the walls outwards, in some cases stepping out the base of the wall and the wall leaned outwards.

Structural repair solution

Action Wall Ties remediation works are designed to provide a cost effective long term repair solution, ameliorating the defects noted, that retains the existing appearance with the minimum effect to the occupants and impact on the environment.

case 20 a - Balustrade wall defects

To stabilise the balustrade wall Action Wall Ties completed remediation, involving cutting expansion (movement) joints and the design fabrication and fixing of restraint posts.

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair to balustrade wall cracking and problems, by providing professional solutions to a wide variety of structural problems in the Kent and London areas. Contact us on 01227 721 255, or email us.

1970s style low-rise block with defects to balustrade walls on balconies

1970s style low-rise block with defects to balustrade walls on balconies

1970s style low-rise blocks with defects to balustrade walls on private balconies – a combination of single corded bed joint reinforcement, AWT diamond drilled for grouted stainless steel pins, removing the existing reinforcing bars, cut handrail and injected grouted steel pins to repair.

case study 56e19aa4d4c4e1.04848680 - 1970s style low-rise block with defects to balustrade walls on balconies

The subject building is a 1970s style low-rise block of domestic apartments in South East London, of conventional construction with open access decks and private balconies.

Rusting of steel reinforcing bars and the handrail baluster fixings had caused potentially dangerous cracking of the balcony walls.

Action Wall Ties’ solution for fixing the cracked brickwork involved reinforcing the brickwork.

The rusted reinforcing bars and other corroded steelwork balusters were removed to prevent further cracking. New stainless steel fixings designed by Action Wall Ties were then fitted and the balcony walls were rendered and made good.

Detailed Case Study:

case 22 a - 1970s style low-rise block with defects to balustrade walls on balconies

Balcony Problems & issues

Visible cracking of brickwork and previous repairs (in a similar pattern) was noted to the inside of the balustrade ½ brick thick walls to the private balconies.

case 22 b - 1970s style low-rise block with defects to balustrade walls on balconies

The balconies’ balustrade walls were all of a similar construction – ½ brick thick stretcher bond brickwork, with faced brickwork externally and render finish to the inside.

They were finished with a concrete coping stone and a steel tubular handrail supported by tubular balusters embedded through the coping stones down into the first two courses of brickwork.

case 22 c - 1970s style low-rise block with defects to balustrade walls on balconies

case 22 d - 1970s style low-rise block with defects to balustrade walls on balconies

Generally the external bricks and pointing were found to be in good condition with little spalled pointing and spalled bricks noted.

There was visible cracking and previous repairs in a similar pattern to the internal render finish, and cracking to the coping stone and first two courses in line with the embedded steel baluster.

case 22 e - 1970s style low-rise block with defects to balustrade walls on balconies

Action Wall Ties’ inspection revealed a heavily corroding 10mm mild steel reinforcing bar, set into the concrete slab adjacent to the brickwork and fixed to the brickwork with mild steel wire ties bent round the upright bar and built into the brickwork bed joint.

case 22 f - 1970s style low-rise block with defects to balustrade walls on balconies

The cracking and previous repairs noted corresponded with the reinforcing bars built into the render finish.

case 22 g - 1970s style low-rise block with defects to balustrade walls on balconies

In line with the embedded tubular handrail baluster some cracked bed joints and dislodged coping stones were noted.

In some cases the cracking continued down through the first two courses of brickwork, in line with the depth of the embedded baluster. The coping stones have no mechanical fixing required by modern day standards.

Discussion

From Action Wall Ties’ findings it is apparent that the cracking to the render finish and cracking to the coping stones and brickwork noted above were due to two generic defects – that of the advanced expanding corrosion to each of the embedded reinforcing bars and the handrail tubular baluster.

The brickwork has admitted moisture, resulting in expanding corrosion (i.e. the formation of ferrous oxide that expands several times the thickness of the metal it has resulted from) on the embedded mild steel, thus cracking brickwork and further fuelling the process by reducing the section of reinforcing bar and the effectiveness of the reinforcing bars.

The ½ brick thick balustrade wall’s lateral stability is dependent on this reinforcement.

The brickwork has admitted moisture running down from the baluster into the masonry resulting in expanding corrosion to the mild steel baluster, thus cracking the brickwork and dislodging the coping stones further fuelling the process.

From our findings an engineering appraisal and remedial strategy was adopted.

The judgment was to determine the extent of the remedial works that should be instigated to accommodate a maintenance program and safety issues assessment.

Structural Repair Solution

Action Wall Ties’ remedial works were designed to provide a cost effective, long term repair solution ameliorating all the defects noted, retaining the existing appearance with the minimum of disruption to occupants and impact on the environment.

case 22 i - 1970s style low-rise block with defects to balustrade walls on balconies

 

Our proposed remedial scheme provided a viable repair with the introduction of a combination of single corded bed joint reinforcement – to remove the handrail and baluster from the brickwork, drill for and grout in AWT designed stainless steel fixings, cut and weld original handrail in place.

case 22 j - 1970s style low-rise block with defects to balustrade walls on balconies

 

AWT Diamond drilled the full height of the balustrade wall into the concrete slab and injected grouted stainless steel pins, removing the existing reinforcing bars from the brickwork and made good the render, drilled for resin bond stainless steel ties and made good coping stones.

Action Wall Ties (AWT) are specialists in masonry reinforcement and repair, replacing corroded embedded steel and re rendering the surface, providing professional solutions to a wide variety of structural problems in the south east including Kent and London. Contact us on 01227 721 255, or email us.

Failing Victorian stone lintel

Failing Victorian stone lintel

Failing Victorian stone lintel – removal reinforced and made good and reinstated

case study 56e19db063b062.32961704 - Failing Victorian stone lintel

The subject building was a traditionally built Victorian house.

There was some visible cracking and dropping of a stone lintel and support brickwork.

On inspection the supporting stone lintel was found to be fractured, resulting in the distortion and dropping of brickwork above it.

There had been previous attempts at repairs and it appeared to be supported with remedial steel pipework.

case 42 a - Failing Victorian stone lintel

case 42 a 1 - Failing Victorian stone lintel

case 42 a 2 - Failing Victorian stone lintel

Stone Lintel Repair Solution

Our client’s paramount concern was to maintain the building’s original fabric and appearance.

We provided temporary support for the brickwork to enable the removal of the existing stone lintel and remedial steel pipe work while leaving the brickwork above and internal brickwork in place.

To reinforce and repair the original stone lintel, we firstly set in line and bonded the stone lintel sections together then cut two chases into the rear of the lintel and grouted in stainless steel reinforcing bars.

case 42 b - Failing Victorian stone lintel

case 42 b 1 - Failing Victorian stone lintel

case 42 c - Failing Victorian stone lintel

case 42 c 1 - Failing Victorian stone lintel

Action Wall Ties services are available to client’s in the South east i.e. in London, Surrey, Kent, Sussex & in Essex

Action Wall Ties (AWT) are specialists in cracked stone lintel repairs providing professional solutions to a wide variety of structural problems in Kent and London (Most of the South East is covered by our specialist teams). Contact us on 01227 721 255, or email us.

logo logo logo logo logo logo